Construction of Precast Reinforced Concrete

Number of journal: 4-2023
Autors:

Fotin O.V.

DOI: https://doi.org/10.31659/0585-430X-2023-812-4-32-34
УДК: 693.95

 

AbstractAbout AuthorsReferences
The prerequisites for the transition to the construction of buildings from prefabricated reinforced concrete in modern conditions are substantiated. It is known that in 2021, the volume of housing construction reached record values in the entire history of the Russian Federation. The “Strategy for the development of the construction industry and housing and communal services of the Russian Federation for the period up to 2030 with a forecast up to 2035” notes the need to reduce the duration of the investment and construction cycle by at least 30% due, among other things, to typical design and mass implementation of precast concrete construction. It is noted that the construction of buildings from prefabricated reinforced concrete, compared with monolithic construction, makes it possible to reduce the cost of construction by at least 20%; reduce construction time by more than 2 times; reduce reinforcement consumption by at least 20%; reduce concrete consumption by at least 30%.
O.V. FOTIN, Deputy Head for Scientific and Technical Issues (This email address is being protected from spambots. You need JavaScript enabled to view it.)

Siberian Branch of the Research Institute of Building Constructions (TSNIISK) named after V.A. Koucherenko, JSC Research Center of Construction (27, Off. 406, Stepana Razina Street, Irkutsk, 664025, Russian Federation)

1. Nikolaev S.V. Revival of large-panel construction in Russia. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2012. No. 4, pp. 2–8. (In Russian).
2. Nikolaev S.V. Social housing at a new stage of improvement. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2013. No. 3, pp. 2–8. (In Russian).
3. Nikolaev S.V. Revival of House Building Factories on the Basis of Domestic Equipment. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2015. No. 2, pp. 4–9. (In Russian).
4. Fotin O.V. System of RKD «Irkutsk frame» of multi-storey buildings and structures. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2015. No. 5, pp. 65–68. (In Russian).
5. Fotin O.V. The system of RCD «Irkutsk frame» of multi-storey buildings and structures. Seismicheskoe stroitel’stvo. Bezopasnost’ sooruzhenii. 2016. No. 1, pp. 44–50. (In Russian).
6. Fotin O.V. Construction of multi-storey buildings from precast reinforced concrete. Zhilishchnoe Stroitel’stvo [Housing Construction]. 2022. No. 10, pp. 19–22. (In Russian). DOI: https://doi.org/10.31659/0044-4472-2022-10-19-22
7. Granik Yu.G. Zavodskoe proizvodstvo elementov polnosbornykh domov [Factory production of elements of fully assembled houses]. Moscow: Stroyizdat. 1984. 221 p.

For citation: Fotin O.V. Construction of precast reinforced concrete. Stroitel’nye Materialy [Construction Materials]. 2023. No. 4, pp. 32–34. (In Russian). DOI: https://doi.org/10.31659/0585-430X-2023-812-4-32-34


Print   Email